2015 IEEE Macau Section — Technical Seminar
Event Menu
Name of Speaker: Mr. Ka-Ip Leong, E&M Senior Engineer, Functional Head of E&M Facilities in Facility Operations and Maintenance Section, UM
Topic: Facilities Management in University of Macau New Campus
Abstract: University of Macau UM in August 2014 relocated to the new campus and it covers approximately 1.09 square kilometres, is 20 times larger than the old campus, and can accommodate at least 15, 000 students. Many electrical and mechanical E&M facilities and systems are being used in the new campus and a good management for such facilities are essential to guarantee all building facilities and systems operating effectively and efficiently and ensuring a safe campus environment to all UM communities. In this seminar, it is mainly to introduce the E&M facilities
and systems, the green design in new campus, the operation and maintenance and the energy saving measures being adopted in UM. The facilities management should be included by not limited to avoid any unnecessary maintenance causing any inconvenience to the community and besides the most important is to avoid any life and property lost. In additional, low cost with high productivity and quality is the goal as well. The system design, operations and maintenance O&M working examples and experiences in facilities management of different facilities and systems will be shared and discussed.
Speaker Biography:
Mr. Leong obtained the Bsc and Msc of electromechanical engineering from the UM in 1999 and 2006 respectively. He joined engineering private company after graduated in 1999 and mainly work on the air conditioning and electrical power system. Two years later, he joined UM in 2002 as an assistant engineer. He has been working for E&M facilities for more than 15 years. He now works in Facility Operations and Maintenance Section as a Functional Head of E&M facilities and his main responsibility is to oversee, plan and manage the E&M facilities in UM. Mr. Leong has widely experience in design, operation and maintenance of building facilities. He has also joined the new campus construction project since the design stage and is familiar with the design of various E&M facilities using in this new campus.
Download flyer.